Research Centre AT Ottakring
Project data
Year
- 1994
Status
- Buildings
Awards / Phase
CCompletedType
- Offices
Size
10.000 m248.2104, 16.3135
The AT Research Centre includes the research and quality assurance laboratories of ATW and offices for rent. On the basis of an urban development report, the location was developed in the course of the new use of the ATW grounds in the area of the U3 terminus. Traffic and loading areas were built over with a statically innovative suspended construction, thus optimizing the site and building.
The elongated building with its three entrances is structured according to its functions for internal and external use.
It was particularly important to the client and the architects to include art not only inside the building, but above all in the transition to public space.



Bilder
ottakring_2500px.jpg - NMPB
atf-06_2500px.jpg - NMPB
ate_02_2500px.jpg - NMPB
d4_2500px.jpg - NMPB
d3_2500px.jpg - NMPB